Put A Number On The Campus Repair Backlog
We assess campus buildings system by system, add up the repair backlog, and turn it into a ranked capital plan your board can follow. It’s the same method we use for any group of buildings, delivered by our team.
Campus buildings build up a specific kind of debt: systems kept in service past their replacement date, a backlog that outgrows the capital budget, and condition data too old to rest a request on.
- Who It’s For
- Vice presidents of facilities, campus planners, budget officers and capital planning staff.
- Deadlines This Work Serves
- Capital requests, board budget meetings and accreditation self-studies.
- Where We Are
- Smyrna, Georgia, working across the Southeast.
What You’re Up Against
Why Campus Renewal Keeps Slipping
The Backlog Outgrows The Budget
Repairs put off this year cost more next year. Without one number for the backlog, it’s hard to show the board how fast it is growing.
Renewal Loses To New Buildings
A new building has a donor and a ribbon cutting. A roof replacement has neither, so renewal requests need stronger evidence to win.
What You Know Lives In People
Building history sits in old reports, work orders and the memory of staff close to retiring. When they leave, the record leaves with them.
What We Deliver
The Evidence Behind Your Next Capital Request
Each engagement is scoped to land before the meeting or filing that needs it. We usually recommend starting with condition and following it with the plan.
Condition, remaining life and cost to repair for every system in your academic buildings, residence halls and support facilities, with one Facility Condition Index (FCI) score per building.
Lands Before
A capital request, or an accreditation self-study
A ranked 10-year capital plan with its scoring printed in the plan, so renewal projects compete on the same terms as everything else.
Lands Before
The board’s budget meeting
For property held outside the core campus: whether each one is worth more to the institution held, improved or sold.
Lands Before
A board decision on a property
What A Portfolio View Looks Like
Every Building On One Screen, Colored By Condition
The example is a fictional county portfolio, not a campus. The method doesn’t change with the building: rate each system, add up what it would cost to fix, and compare buildings side by side. Roof color shows each building’s FCI band. FCI is its repair backlog divided by what it would cost to replace.
The Portfolio At A Glance
2 healthy, under 5%3 watch, 5%–10%3 critical, over 10%Height shows floor area
Main Library
Built 1974 · 62,000 sq ft · 4 floors
Fund first
Roof
Condition 2 of 10 · 1 yr left · $1.3M to renew
Then Every System, Building By Building
Each row is a building and each column a system, scored from 1 (failing) to 10 (like new). The few that need money first stand out before anyone reads a number.
Every Building, Every System
| Building | Roof | Walls & windows | Heating/cooling | Electrical | Plumbing | Elevators | Fire protection | Controls | Finishes | Site | FCI |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Main LibraryBuilt 1974 | Roof: condition 2 of 10, 1 yr left | Exterior walls & windows: condition 5 of 10, 14 yrs left | Heating & cooling: condition 3 of 10, 1 yr left | Electrical: condition 5 of 10, 9 yrs left | Plumbing: condition 6 of 10, 12 yrs left | Conveying (elevators): condition 5 of 10, 6 yrs left | Fire protection: condition 6 of 10, 11 yrs left | Building controls: condition 4 of 10, 4 yrs left | Finishes, partitions & ceilings: condition 5 of 10, 5 yrs left | Site, paving & drainage: condition 6 of 10, 8 yrs left | 12.2% |
| Eastside Branch LibraryBuilt 1998 | Roof: condition 7 of 10, 9 yrs left | Exterior walls & windows: condition 8 of 10, 24 yrs left | Heating & cooling: condition 6 of 10, 8 yrs left | Electrical: condition 7 of 10, 18 yrs left | Plumbing: condition 8 of 10, 22 yrs left | Conveying (elevators): condition 7 of 10, 12 yrs left | Fire protection: condition 8 of 10, 20 yrs left | Building controls: condition 4 of 10, 1 yr left | Finishes, partitions & ceilings: condition 6 of 10, 6 yrs left | Site, paving & drainage: condition 7 of 10, 10 yrs left | 3.0% |
| Fire Station 3Built 1988 | Roof: condition 6 of 10, 7 yrs left | Exterior walls & windows: condition 7 of 10, 20 yrs left | Heating & cooling: condition 3 of 10, 2 yrs left | Electrical: condition 6 of 10, 12 yrs left | Plumbing: condition 6 of 10, 14 yrs left | Conveying (elevators): condition 6 of 10, 9 yrs left | Fire protection: condition 7 of 10, 15 yrs left | Building controls: condition 5 of 10, 5 yrs left | Finishes, partitions & ceilings: condition 6 of 10, 6 yrs left | Site, paving & drainage: condition 6 of 10, 9 yrs left | 7.2% |
| Public Works YardBuilt 1969 | Roof: condition 3 of 10, 1 yr left | Exterior walls & windows: condition 3 of 10, 4 yrs left | Heating & cooling: condition 5 of 10, 6 yrs left | Electrical: condition 2 of 10, 2 yrs left | Plumbing: condition 5 of 10, 9 yrs left | Conveying (elevators): condition 4 of 10, 5 yrs left | Fire protection: condition 5 of 10, 8 yrs left | Building controls: condition 4 of 10, 3 yrs left | Finishes, partitions & ceilings: condition 5 of 10, 4 yrs left | Site, paving & drainage: condition 4 of 10, 4 yrs left | 11.3% |
| Civic CenterBuilt 1982 | Roof: condition 3 of 10, 2 yrs left | Exterior walls & windows: condition 6 of 10, 18 yrs left | Heating & cooling: condition 5 of 10, 6 yrs left | Electrical: condition 6 of 10, 12 yrs left | Plumbing: condition 6 of 10, 15 yrs left | Conveying (elevators): condition 5 of 10, 7 yrs left | Fire protection: condition 3 of 10, 3 yrs left | Building controls: condition 5 of 10, 5 yrs left | Finishes, partitions & ceilings: condition 6 of 10, 7 yrs left | Site, paving & drainage: condition 6 of 10, 10 yrs left | 6.0% |
| Riverside Community CenterBuilt 2006 | Roof: condition 8 of 10, 12 yrs left | Exterior walls & windows: condition 8 of 10, 30 yrs left | Heating & cooling: condition 7 of 10, 11 yrs left | Electrical: condition 8 of 10, 22 yrs left | Plumbing: condition 8 of 10, 28 yrs left | Conveying (elevators): condition 8 of 10, 15 yrs left | Fire protection: condition 8 of 10, 24 yrs left | Building controls: condition 7 of 10, 7 yrs left | Finishes, partitions & ceilings: condition 7 of 10, 8 yrs left | Site, paving & drainage: condition 7 of 10, 13 yrs left | 0.0% |
| Parks Maintenance ShopBuilt 1979 | Roof: condition 5 of 10, 6 yrs left | Exterior walls & windows: condition 5 of 10, 12 yrs left | Heating & cooling: condition 2 of 10, 1 yr left | Electrical: condition 5 of 10, 8 yrs left | Plumbing: condition 5 of 10, 10 yrs left | Conveying (elevators): condition 5 of 10, 6 yrs left | Fire protection: condition 5 of 10, 9 yrs left | Building controls: condition 4 of 10, 3 yrs left | Finishes, partitions & ceilings: condition 3 of 10, 2 yrs left | Site, paving & drainage: condition 5 of 10, 6 yrs left | 12.6% |
| Courthouse Parking DeckBuilt 1991 | Roof: condition 6 of 10, 8 yrs left | Exterior walls & windows: condition 6 of 10, 16 yrs left | Heating & cooling: condition 6 of 10, 9 yrs left | Electrical: condition 3 of 10, 2 yrs left | Plumbing: condition 6 of 10, 13 yrs left | Conveying (elevators): condition 3 of 10, 1 yr left | Fire protection: condition 2 of 10, 2 yrs left | Building controls: condition 5 of 10, 4 yrs left | Finishes, partitions & ceilings: condition 6 of 10, 8 yrs left | Site, paving & drainage: condition 5 of 10, 5 yrs left | 5.5% |
Orange: 3 or lower, poor condition
Scroll sideways for every system.
- Solicitations
- We respond to requests for qualifications (RFQs) and requests for proposals (RFPs).
- Documents
- Capability statement, W-9 and certificate of insurance available on request.
- Pricing
- By scope: how many buildings, which engagements, and how complete your records are. Set out in the proposal.
- Office
- Portfoliq is headquartered at 2310 Goodwood Blvd SE, Smyrna, GA 30080, and works with owners and public agencies across the Southeast.
Questions We Hear
What We’re Asked Before A First Call
Does your method work for academic buildings and residence halls?
Yes. Each building is rated system by system, from the roof to heating and cooling to electrical, the same way whatever it houses. The building’s use changes the costs, not the method.
Can you work from our last facility condition assessment?
Yes. We carry earlier ratings forward with their original report and date, and update the systems that have changed. Where a building has no usable record, we scope a field assessment with you.
Do you lead campus master plans?
No. We supply the condition and cost data a master planning team works from: what each building needs, what it will cost, and how soon.
How long does it take, and how is it priced?
A condition assessment typically takes about 12 weeks, depending on how many buildings and how complete your records are. Pricing is by scope; contact us for a scoped proposal.
Tell Us When Your Capital Request Is Due
A building list and the date your board needs the request is enough to start. We’ll outline what can be ready by then.