Facility Condition Assessment(FCA)
An inspection of a building, system by system, that records what condition each part is in and what it would cost to fix or replace.
An assessment produces the numbers behind everything else on this page: the list of needed repairs, their costs, and when each system will wear out. It is typically repeated every few years, or run on part of a portfolio each year on a rolling schedule. Our assessments rate 15 building systems on a 1–10 condition scale.
Where you’ll see itFacility Condition Assessment→
Deferred Maintenance
Repairs and replacements that were due but have been put off, usually because the budget ran short.
Often called the repair backlog, it is counted in dollars: what it would cost today to bring each worn system back to good working order. Left alone, it tends to grow, because a failing part can damage the systems around it. It is the top half of the Facility Condition Index.
Where you’ll see itFacility Condition Assessment→
Replacement Cost
What it would cost today to build an equivalent building, or put in an equivalent system, from scratch.
Also called current replacement value. It is usually estimated from a cost per square foot for that type of building, not from what the building originally cost or what it would sell for. It is the bottom half of the Facility Condition Index, so an out-of-date replacement cost makes every index look better or worse than it really is.
Where you’ll see itFacility Condition Assessment→
Facility Condition Index(FCI)
A building’s repair backlog divided by what it would cost to replace the building, shown as a percentage.
An index of 4% means the needed repairs add up to 4% of what a new building would cost, so lower is better. A common reading is under 5% good, 5–10% fair and over 10% poor; those are the default bands in our platform (Healthy, Watch and Critical), and an owner can set its own. Because it is a ratio, it puts a small branch library and a large public works yard on the same scale.
Where you’ll see itFacility Condition Assessment→
Remaining Useful Life
How many more years a building system is expected to keep working before it needs replacing.
It starts from the system’s typical lifespan and its age, then an inspection can shorten or lengthen it: a 20-year roof that is 15 years old has about five years left on paper. It decides when a replacement shows up in the capital plan. In our project scoring it carries 30 of 100 points, and a system with a year or less left is flagged to fund first.
Where you’ll see itFacility Condition Assessment→
Uniformat
A standard way of sorting a building into its parts, such as roof, walls, heating and cooling, plumbing and electrical, so every report groups them the same way.
It is widely used in construction cost estimating and condition assessment. Its top-level groups are lettered, from A (Substructure) and B (Shell) through D (Services) to G (Building Sitework). Our 15 building systems map to these groups, so a report reads the way an estimator or reviewer expects.
Where you’ll see itFacility Condition Assessment→